  "id": "nrel-geothermal-drilling-2025-f1",
  "slug": "full-size-well-drilling-drives-geothermal-plant-capital-cost",
  "title": "Full-size well drilling drives geothermal plant capital cost",
  "flag": "Based on internal analysis carried out by the National Renewable Energy Laboratory (NREL), drilling full-size wells for both resource confirmation and field development currently accounts for 30% to 57% of the overnight capital cost to install a new plant.",
  "blurb": "A 2025 National Renewable Energy Laboratory update reports that drilling full-size wells for resource confirmation and field development accounts for 30% to 57% of the overnight capital cost of a new plant. The figure comes from NREL internal analysis.",
  "source_title": "2025 Geothermal Drilling Cost Curves Update",
  "authors": [
   "Dayo Akindipe",
   "Erik Witter"
  ],
  "year": 2025,
  "date": "2025-07-15",
  "date_label": "July 2025",
  "age": "1 year ago",
  "field": "Geothermal energy",
  "kind": "physical",
  "url": "https://www.osti.gov/servlets/purl/2583680",
  "doi": null,
  "status": "current"
 },
 {
  "id": "lbnl-queued-up-2025-f1",
  "slug": "interconnection-to-operation-now-takes-55-months-for-new-power-projects",
  "title": "Interconnection to operation now takes 55 months for new power projects",
  "flag": "The typical project built in 2024 took 55 months from the interconnection request to commercial operations, compared to 36 months in 2015 and 22 months in 2008.",
  "blurb": "A 2025 Berkeley Lab report says the typical project built in 2024 took 55 months from interconnection request to commercial operations. That compares with 36 months in 2015 and 22 months in 2008.",
  "source_title": "Queued Up: 2025 Edition, Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2024",
  "authors": [
   "Joseph Rand",
   "Nick Manderlink",
   "Steven Zhang",
   "Chris Talley",
   "Will Gorman",
   "Ryan Wiser"
  ],
  "year": 2025,
  "date": "2025-12-15",
  "date_label": "December 2025",
  "age": "11 months ago",
  "field": "Electric grid",
  "kind": "regulatory",
  "url": "https://emp.lbl.gov/sites/default/files/2025-12/Queued%20Up%202025%20Edition%20-%2012.15.2025.pdf",
  "doi": null,
  "status": "current"
 },
 {
  "id": "iea-critical-minerals-2024-f1",
  "slug": "copper-supply-gap-persists-in-2030-despite-high-mined-output",
  "title": "Copper supply gap persists in 2030 despite high mined output",
  "flag": "Even in the high production case where almost 2 Mt of extra mined supply is available shows a supply gap of 2.2 Mt (10%) to meet demand required by government climate pledges while there is a 4.5 Mt (20%) shortfall to match demand in the NZE Scenario in 2030. This demonstrates the urgency of financing and approving new supply projects given the long lead times to bring online new production.",
  "blurb": "The IEA's Global Critical Minerals Outlook 2024, published in May 2024, reports that even in a high production case with almost 2 Mt of extra mined supply, a 2.2 Mt (10%) gap remains against demand from government climate pledges. It also reports a 4.5 Mt (20%) shortfall against the NZE Scenario in 2030, and stresses the long lead times for new production.",
  "source_title": "Global Critical Minerals Outlook 2024",
  "authors": [
   "International Energy Agency"
  ],
  "year": 2024,
  "date": "2024-05-16",
  "date_label": "May 2024",
  "age": "2 years ago",
  "field": "Critical minerals",
  "kind": "supply",
  "url": "https://www.iea.org/files/ee01701d-1d5c-4ba8-9df6-abeeac9de99a/GlobalCriticalMineralsOutlook2024.pdf",
  "doi": null,
  "status": "current"
 },
 {
  "id": "fesac-fcp-2024-f2",
  "slug": "lack-of-a-relevant-testing-environment-for-fusion-materials",
  "title": "Lack of a relevant testing environment for fusion materials",
  "flag": "Currently there are large knowledge gaps for many proposed fusion materials due to the lack of a relevant testing environment.",
  "blurb": "A 2024 report from the Fusion Energy Sciences Advisory Committee says many proposed fusion materials have large knowledge gaps. It attributes this to the lack of a relevant testing environment.",
  "source_title": "Report of the FESAC Facilities Construction Projects Subcommittee",
  "authors": [
   "Fusion Energy Sciences Advisory Committee"
  ],
  "year": 2024,
  "date": "2024-04-24",
  "date_label": "April 2024",
  "age": "2 years ago",
  "field": "Fusion energy",
  "kind": "tooling",
  "url": "https://science.osti.gov/-/media/fes/fesac/pdf/2024/FCPREPORT--final-submittedapproved0424.pdf",
  "doi": null,
  "status": "current"
 },
 {
  "id": "doe-lpt-resilience-2024-f1",
  "slug": "large-power-transformer-lead-times-of-36-to-60-months",
  "title": "Large power transformer lead times of 36 to 60 months",
  "flag": "In addition, another obstacle has recently emerged: lead times for acquisition of an LPT have become exceptionally long, with 36-month lead times being commonly quoted and maximum lead times reaching as much as 60 months.",
  "blurb": "A 2024 U.S. Department of Energy report to Congress says lead times for acquiring a large power transformer are commonly quoted at 36 months. Maximum lead times reach as much as 60 months.",
  "source_title": "Large Power Transformer Resilience, Report to Congress",
  "authors": [
   "U.S. Department of Energy"
  ],
  "year": 2024,
  "date": "2024-07-10",
  "date_label": "July 2024",
  "age": "2 years ago",
  "field": "Electric grid",
  "kind": "supply",
  "url": "https://www.energy.gov/sites/default/files/2024-10/EXEC-2022-001242%20-%20Large%20Power%20Transformer%20Resilience%20Report%207-10-24.pdf",
  "doi": null,
  "status": "current"
 },
 {
  "id": "W7135185601-f1",
  "slug": "grid-power-for-large-data-centers-can-take-4-to-5-years",
  "title": "Grid power for large data centers can take 4 to 5+ years",
  "flag": ", building a data center typically takes 18–36 months; however, with the growing interconnection queue and massive processing backlogs, powering an actual data center from the electric grid may often require 4 – 5 + years.",
  "blurb": "A 2026 source reports that building a data center typically takes 18 to 36 months. It says growing interconnection queues and processing backlogs can mean powering the site from the grid often takes 4 to 5 or more years.",
  "source_title": "Scalable data centers – Power generation and delivery challenges and solutions",
  "authors": [
   "Soham Ghosh",
   "Jaya Damodara"
  ],
  "year": 2026,
  "date": "2026-03-13",
  "date_label": "March 2026",
  "age": "8 months ago",
  "field": "Electric grid",
  "kind": "physical",
  "url": "https://doi.org/10.1016/j.egyr.2026.109178",
  "doi": "https://doi.org/10.1016/j.egyr.2026.109178",
  "status": "current"
 },
 {
  "id": "W4413360549-f1",
  "slug": "dram-bandwidth-saturation-limits-large-batch-llm-inference-on-gpus",
  "title": "DRAM bandwidth saturation limits large-batch LLM inference on GPUs",
  "flag": "In this paper, through an in-depth GPU-level analysis, we reveal that large-batch inference remains memory-bound, with most GPU compute capabilities underutilized due to DRAM bandwidth saturation as the primary bottleneck.",
  "blurb": "A 2025 paper reports that large-batch LLM inference stays memory-bound on GPUs. Most compute capability goes underused because DRAM bandwidth saturation is the primary bottleneck.",
  "source_title": "Mind the Memory Gap: Unveiling GPU Bottlenecks in Large-Batch LLM Inference",
  "authors": [
   "Pol G. Recasens",
   "Ferran Agullo",
   "Yue Fei Zhu",
   "Chen Wang",
   "Eun Kyung Lee",
   "Olivier Tardieu"
  ],
  "year": 2025,
  "date": "2025-07-07",
  "date_label": "July 2025",
  "age": "1 year ago",
  "field": "AI infrastructure",
  "kind": "physical",
  "url": "https://doi.org/10.1109/cloud67622.2025.00036",
  "doi": "https://doi.org/10.1109/cloud67622.2025.00036",
  "status": "current"
 },
 {
  "id": "W4408188551-f1",
  "slug": "quantum-error-correction-overhead-limits-fault-tolerant-quantum-computing",
  "title": "Quantum error correction overhead limits fault-tolerant quantum computing",
  "flag": "The overhead of quantum error correction (QEC) poses a major bottleneck for realizing fault-tolerant computation.",
  "blurb": "A March 2025 paper on fault-tolerant architectures based on erasure qubits reports that the overhead of quantum error correction is a major bottleneck for realizing fault-tolerant computation. The source gives no further detail on the size of that overhead.",
  "source_title": "Fault-tolerant quantum architectures based on erasure qubits",
  "authors": [
   "Shouzhen Gu",
   "Alex Retzker",
   "Aleksander Kubica"
  ],
  "year": 2025,
  "date": "2025-03-06",
  "date_label": "March 2025",
  "age": "1 year ago",
  "field": "Quantum computing",
  "kind": "physical",
  "url": "https://doi.org/10.1103/physrevresearch.7.013249",
  "doi": "https://doi.org/10.1103/physrevresearch.7.013249",
  "status": "current"
 },
 {
  "id": "W4403302755-f1",
  "slug": "slow-oxygen-evolution-and-scarce-ru-and-ir-catalysts-in-pem-electrolyzers",
  "title": "Slow oxygen evolution and scarce Ru and Ir catalysts in PEM electrolyzers",
  "flag": "The oxygen evolution reaction (OER) at the anode is the primary bottleneck preventing the industrial-scale application of PEMWEs due to its sluggish kinetics, and it presently relies upon electrocatalysts that use scarce, costly Ru and Ir.",
  "blurb": "A 2024 paper reports that the oxygen evolution reaction at the anode is the primary bottleneck preventing industrial-scale PEM water electrolyzers. It cites sluggish kinetics and reliance on scarce, costly Ru and Ir electrocatalysts.",
  "source_title": "Recent advances and modulation tactics in Ru- and Ir-based electrocatalysts for PEMWE anodes at large current densities",
  "authors": [
   "Yu Wang",
   "Haijing Yan",
   "Honggang Fu"
  ],
  "year": 2024,
  "date": "2024-10-10",
  "date_label": "October 2024",
  "age": "2 years ago",
  "field": "Hydrogen",
  "kind": "physical",
  "url": "https://doi.org/10.1016/j.esci.2024.100323",
  "doi": "https://doi.org/10.1016/j.esci.2024.100323",
  "status": "current"
 },
 {
  "id": "W4378901999-f1",
  "slug": "temperature-and-pressure-response-limit-variable-operation-of-pv-powered-electrolyzers",
  "title": "Temperature and pressure response limit variable operation of PV-powered electrolyzers",
  "flag": "The electrical response of water electrolyzers is extremely fast, making the slower variables, such as temperature and pressure, the limiting factors for variable operation typically associated with PV-powered electrolysis systems.",
  "blurb": "A 2023 review reports that the electrical response of water electrolyzers is extremely fast. It finds the slower variables, such as temperature and pressure, are the limiting factors for variable operation in PV-powered systems.",
  "source_title": "Dynamic operation of water electrolyzers: A review for applications in photovoltaic systems integration",
  "authors": [
   "Victor Arturo Martinez Lopez",
   "Hesan Ziar",
   "Johannes Wilhelmus Haverkort",
   "Miro Zeman",
   "Olindo Isabella"
  ],
  "year": 2023,
  "date": "2023-05-31",
  "date_label": "May 2023",
  "age": "3 years ago",
  "field": "Hydrogen",
  "kind": "physical",
  "url": "https://doi.org/10.1016/j.rser.2023.113407",
  "doi": "https://doi.org/10.1016/j.rser.2023.113407",
  "status": "current"
 },
 {
  "id": "W4220912955-f1",
  "slug": "capture-energy-use-absorbent-loss-and-stability-constrain-large-scale-ccs",
  "title": "Capture energy use, absorbent loss and stability constrain large-scale CCS",
  "flag": "Reducing the energy consumption of low-concentration CO2 capture and the depletion of chemical absorbents and improving the operational efficiency and stability of post-combustion CO2 capture systems have become the key constraints to large-scale CCS deployment.",
  "blurb": "A 2022 review reports that the energy consumption of low-concentration CO2 capture and the depletion of chemical absorbents are key constraints on large-scale CCS deployment. It also names the operational efficiency and stability of post-combustion capture systems.",
  "source_title": "Carbon Capture and Storage: History and the Road Ahead",
  "authors": [
   "Jinfeng Ma",
   "Lin Li",
   "Haofan Wang",
   "Yi Bo Du",
   "Junjie Ma",
   "Xiaoli Zhang"
  ],
  "year": 2022,
  "date": "2022-03-12",
  "date_label": "March 2022",
  "age": "4 years ago",
  "field": "Carbon management",
  "kind": "physical",
  "url": "https://doi.org/10.1016/j.eng.2021.11.024",
  "doi": "https://doi.org/10.1016/j.eng.2021.11.024",
  "status": "current"
 }
]