Talks of Record Bottlenecks

Physical

7 current physical constraints.

  • Full-size well drilling drives geothermal plant capital costA 2025 National Renewable Energy Laboratory update reports that drilling full-size wells for resource confirmation and field development accounts for 30% to 57% of the overnight capital cost of a new plant. The figure comes from NREL internal analysis.Geothermal energy · Physical · July 2025, 1 year ago
  • Grid power for large data centers can take 4 to 5+ yearsA 2026 source reports that building a data center typically takes 18 to 36 months. It says growing interconnection queues and processing backlogs can mean powering the site from the grid often takes 4 to 5 or more years.Electric grid · Physical · March 2026, 8 months ago
  • DRAM bandwidth saturation limits large-batch LLM inference on GPUsA 2025 paper reports that large-batch LLM inference stays memory-bound on GPUs. Most compute capability goes underused because DRAM bandwidth saturation is the primary bottleneck.AI infrastructure · Physical · July 2025, 1 year ago
  • Quantum error correction overhead limits fault-tolerant quantum computingA March 2025 paper on fault-tolerant architectures based on erasure qubits reports that the overhead of quantum error correction is a major bottleneck for realizing fault-tolerant computation. The source gives no further detail on the size of that overhead.Quantum computing · Physical · March 2025, 1 year ago
  • Slow oxygen evolution and scarce Ru and Ir catalysts in PEM electrolyzersA 2024 paper reports that the oxygen evolution reaction at the anode is the primary bottleneck preventing industrial-scale PEM water electrolyzers. It cites sluggish kinetics and reliance on scarce, costly Ru and Ir electrocatalysts.Hydrogen · Physical · October 2024, 2 years ago
  • Temperature and pressure response limit variable operation of PV-powered electrolyzersA 2023 review reports that the electrical response of water electrolyzers is extremely fast. It finds the slower variables, such as temperature and pressure, are the limiting factors for variable operation in PV-powered systems.Hydrogen · Physical · May 2023, 3 years ago
  • Capture energy use, absorbent loss and stability constrain large-scale CCSA 2022 review reports that the energy consumption of low-concentration CO2 capture and the depletion of chemical absorbents are key constraints on large-scale CCS deployment. It also names the operational efficiency and stability of post-combustion capture systems.Carbon management · Physical · March 2022, 4 years ago