Talks of Record Bottlenecks

Bottlenecks

Specific bottlenecks holding back progress, with sources.

  • 11current bottlenecks
  • 8fields
  • 4kinds of constraint
  • 11source documents

Electric grid

  • Interconnection to operation now takes 55 months for new power projectsA 2025 Berkeley Lab report says the typical project built in 2024 took 55 months from interconnection request to commercial operations. That compares with 36 months in 2015 and 22 months in 2008.Electric grid · Regulatory · December 2025, 11 months ago
  • Large power transformer lead times of 36 to 60 monthsA 2024 U.S. Department of Energy report to Congress says lead times for acquiring a large power transformer are commonly quoted at 36 months. Maximum lead times reach as much as 60 months.Electric grid · Supply · July 2024, 2 years ago
  • Grid power for large data centers can take 4 to 5+ yearsA 2026 source reports that building a data center typically takes 18 to 36 months. It says growing interconnection queues and processing backlogs can mean powering the site from the grid often takes 4 to 5 or more years.Electric grid · Physical · March 2026, 8 months ago

All 3 in Electric grid

Hydrogen

All 2 in Hydrogen

AI infrastructure

All 1 in AI infrastructure

Carbon management

  • Capture energy use, absorbent loss and stability constrain large-scale CCSA 2022 review reports that the energy consumption of low-concentration CO2 capture and the depletion of chemical absorbents are key constraints on large-scale CCS deployment. It also names the operational efficiency and stability of post-combustion capture systems.Carbon management · Physical · March 2022, 4 years ago

All 1 in Carbon management

Critical minerals

  • Copper supply gap persists in 2030 despite high mined outputThe IEA's Global Critical Minerals Outlook 2024, published in May 2024, reports that even in a high production case with almost 2 Mt of extra mined supply, a 2.2 Mt (10%) gap remains against demand from government climate pledges. It also reports a 4.5 Mt (20%) shortfall against the NZE Scenario in 2030, and stresses the long lead times for new production.Critical minerals · Supply · May 2024, 2 years ago

All 1 in Critical minerals

Fusion energy

  • Lack of a relevant testing environment for fusion materialsA 2024 report from the Fusion Energy Sciences Advisory Committee says many proposed fusion materials have large knowledge gaps. It attributes this to the lack of a relevant testing environment.Fusion energy · Tooling · April 2024, 2 years ago

All 1 in Fusion energy

Geothermal energy

  • Full-size well drilling drives geothermal plant capital costA 2025 National Renewable Energy Laboratory update reports that drilling full-size wells for resource confirmation and field development accounts for 30% to 57% of the overnight capital cost of a new plant. The figure comes from NREL internal analysis.Geothermal energy · Physical · July 2025, 1 year ago

All 1 in Geothermal energy

Quantum computing

  • Quantum error correction overhead limits fault-tolerant quantum computingA March 2025 paper on fault-tolerant architectures based on erasure qubits reports that the overhead of quantum error correction is a major bottleneck for realizing fault-tolerant computation. The source gives no further detail on the size of that overhead.Quantum computing · Physical · March 2025, 1 year ago

All 1 in Quantum computing