Talks of Record Bottlenecks

Large power transformer lead times of 36 to 60 months

July 2024, 2 years ago. Electric grid, supply constraint.

  • SourceLarge Power Transformer Resilience, Report to Congress
  • AuthorsU.S. Department of Energy
  • DateJuly 2024, 2 years ago
  • FieldElectric grid
  • KindSupply

In addition, another obstacle has recently emerged: lead times for acquisition of an LPT have become exceptionally long, with 36-month lead times being commonly quoted and maximum lead times reaching as much as 60 months.

Source: Large Power Transformer Resilience, Report to Congress (2024).

A 2024 U.S. Department of Energy report to Congress says lead times for acquiring a large power transformer are commonly quoted at 36 months. Maximum lead times reach as much as 60 months.